Space dividers for hospital

  • 8/9/2016 1:32:00 PM
  • View Count 784
  • Return

The main reception area called for a stacking cavity solution that required 3.2m high doors, spanning a total opening of 6.5m – meeting a fixed panel at one end. The doors had to be functional enough so that all staff could close them off and lock down when required with ease. A great feature of the OvertakingDoors cavity system is that there are no visible floor guides running through the opening at all - leaving a clear and unobstructed walkway. This scenario was repeated throughout the fitout to divide up lunchrooms and meeting room areas when required. Overtaking cavity units maximize your opening with a minimum of pocket space required.

The hospital was also one of the first hospitals to utilise CS touch-free entry devices to their staff toilets. The doors are opened by an infra red hand swipe device that emits a short contact beam. This means that a quick wave of the hand will open the door, keeping potentially dirty hands off the door handle. The door leaf chosen was a piece of 10mm toughened glass which is extremely easy to keep clean.

 

Architect            Chow Hill Architects

Contractor         Mainzeal Construction

Products used in this project:

Related

Share

Post a Comment

 

Categories

 

  • Recent
  • Popular
  • Tag
  • Beachlands Showhome

    Beachlands Showhome

    Sofstop cavity slider for show home
  • Omaha Beach House

    Omaha Beach House

    Tough fixtures and fittings to handle the harsh salt environment.
  • New Product - SquareFormed cavity slider

    New Product - SquareFormed cavity slider

    For that discreet door in your life! Our new SquareStop Split Jamb makes finishing of this product quicker, easier, neater and stronger. Options are available to suit 10mm or 13mm linings.
  • Hamilton Home

    Hamilton Home

    NewYorker doors provide a uniform look throughout the door schedule